Infrastructure Roadshow 2025 PPT Structure and Cover: A Complete Event Overview Guide

Infrastructure Roadshow 2025: Korea–Bangladesh Infrastructure Cooperation Event Overview

Infrastructure Roadshow 2025 is a Korea–Bangladesh infrastructure cooperation event hosted by the KOTRA Dhaka Trade Office. Seven major Bangladeshi infrastructure agencies — ECNEC, DMTCL, BR, BBA, PGCB, BREB, and DESCO — present their 2025–2030 new projects to Korean firms and conduct on-site one-on-one consultations. A pipeline exceeding $45B across transportation, energy, and urban development is disclosed at this event.

Since the interim government took office in 2024, Bangladesh's infrastructure market has shifted toward enhanced transparency and expanded MDB procurement. This Roadshow serves as the key touchpoint for Korean firms to prepare for EDCF tied and MDB ICB bids and to build trusted relationships with Bangladeshi infrastructure agencies. More than 50 Korean firms participate, with over 200 one-on-one consultations conducted.

7
Presenting Agencies
Bangladesh government infrastructure bodies
$45B+
Total Project Scale
2025–2030 pipeline
50+
Korean Participants
Power, transportation, construction, ICT
200+
1-on-1 Consultations
Agency-matched consultations
4 Major
Sectors
Transport, energy, urban development, water
ADB·JICA·WB·EDCF
Key Financing
MDB + bilateral loans
$1B+
EDCF Tied Opportunity
Korean firm priority procurement
12 MOUs
Event Outcomes
Korea–Bangladesh firm/agency agreements

Full Presentation Session Schedule

Infrastructure Roadshow 2025 is structured in four blocks: morning keynote, morning transportation sessions, afternoon energy sessions, and afternoon one-on-one consultations. Each Bangladeshi agency delivers a 20–30 minute presentation followed by Q&A. All sessions are conducted in English with Korean interpretation provided.

Infrastructure Roadshow 2025 Presentation Session Timetable
TimeSessionAgencyTopicProject Scale
09:00–09:30KeynoteECNECBangladesh National Infrastructure Investment Strategy 2025–2030$45B+
09:30–10:00Transport 1DMTCLDhaka Metro Rail 6-Line Expansion Plan$25B
10:00–10:30Transport 2BRRailway Double-Tracking and Electrification — 5 Projects$6B
10:30–11:00Transport 3BBABangladesh Bridge Authority — 12 Projects$8B
11:00–11:30Energy 1PGCB400kV Transmission Grid Expansion and Substation GIS Modernization$8B
13:00–13:30Energy 2BREBRural Distribution Grid and 10 Million Smart Meters$3B
13:30–14:00Energy 3DESCODhaka Power Distribution Modernization, AMI, and EV Charging$1.5B
14:00–18:001-on-1 ConsultationsAll AgenciesAgency-matched consultations (30 min each)200+

Seven Participating Agencies

01
ECNEC (Executive Committee of the National Economic Council)
Bangladesh's highest economic and infrastructure decision-making body. Oversees national infrastructure investment priorities and 250+ approved projects. Announces the $45B+ 2025–2030 investment plan. The core information source for Korean firms building their Bangladesh entry strategy.
02
DMTCL (Dhaka Mass Transit Company Limited)
Agency building and operating 6-line, 129 km Dhaka metro rail. MRT-6 is in operation (500,000 passengers/day); MRT-1 Airport Line is under construction. $25B+ investment. EDCF tied MRT-5 signaling system is the top-priority opportunity for Korean firms.
03
BR (Bangladesh Railway)
Pursuing double-tracking (685 km), electrification (250 km), and rolling stock modernization of the 3,000 km state railway. $6B+ investment. EDCF tied electrification package and ADB ICB double-tracking civil works are major targets for Korean firms.
04
BBA (Bangladesh Bridge Authority)
Central agency overseeing highway and bridge construction in Bangladesh. 12 bridge and highway projects ($8B). Korean firm participation opportunities in Padma Bridge-connected highways and ADB-financed bridge structures.
05
PGCB (Power Grid Company of Bangladesh)
2,500 km of 400kV transmission line expansion, 30 GIS substations, SCADA modernization. $8B+ investment. EDCF tied southern substation package is the core target for Korean power equipment firms.
06
BREB (Bangladesh Rural Electrification Board)
Rural distribution grid modernization, 10 million smart meters (WB $600M), 50,000 transformer replacements (EDCF). $3B+ investment. EDCF amorphous transformer replacement is the top-priority target for Korean firms.
07
DESCO (Dhaka Electric Supply Company)
Supplying power to 8 million residents in northern and eastern Dhaka. Phase 4 undergrounding — 1,250 km ($1.37B), 2 million AMI units ($300M), 500 EV chargers. EDCF tied Phase 4 undergrounding is the top priority for Korean cable firms.

Sector-Wide Project Pipeline Summary

Infrastructure Roadshow 2025 — Project Summary by Sector
SectorAgencyCore ProjectScaleEDCF TiedKorean Priority
Urban RailDMTCLMRT-5 Signaling, MRT-1 Communications$300M+Yes★★★★★
Energy (Distribution)BREB50,000 Amorphous Transformers$200MYes★★★★★
Energy (Transmission)PGCBGIS, Transformers, SCADA$400MYes★★★★★
Energy (Distribution)DESCOPhase 4 Underground Cables$420MYes★★★★★
RailwayBRElectrification Package$400MYes★★★★
BridgesBBA3 ADB Bridges$300MPartial★★★
Smart MetersBREB/DESCO12 Million AMI Units$900MNo★★★ (ICB)

Pre-Event Preparation Checklist

Infrastructure Roadshow 2025 — Korean Firm Pre-Event Preparation Checklist
Preparation ItemContentDeadlineResponsible Party
Select Focus SectorsChoose 2–3 core targets from 7 agencies; pre-study presentation materials2 weeks before eventCompany itself
Prepare Track RecordEnglish summary of comparable overseas delivery experience (approx. 2 pages)2 weeks before eventCompany itself
Technical CatalogsKorean/English product catalogs and specifications (PDF)1 week before eventCompany itself
Apply for 1-on-1 ConsultationsSubmit agency consultation matching request to KOTRA3 weeks before eventVia KOTRA
Korea Eximbank ConsultationPre-confirm EDCF tied project eligibility (applicable firms)As early as possibleKorea Eximbank
Secure InterpretationArrange technical domain interpreter or request KOTRA interpretation1 week before eventVia KOTRA
Transportation Sector Firm Checklist
Signaling and CommunicationsDMTCL (MRT-5 CBTC) + BR (electrification signaling)
Rolling Stock and EquipmentDMTCL (EMUs) + BR (diesel and EMUs)
Structures and Civil WorksBBA (bridges) + BR (double-tracking civil)
Key FinancingMust confirm EDCF tied eligibility with Korea Eximbank in advance
Energy Sector Firm Checklist
Power EquipmentPGCB (GIS, transformers) + BREB (amorphous transformers)
AMI and MeteringBREB (10M units) + DESCO (2M units) WB ICB
CablesDESCO (underground EDCF Phase 4) + PGCB (XLPE)
Key FinancingMust distinguish WB ICB (AMI) vs. EDCF tied (transformers, GIS)

Korean Firm Participation Strategy and Preparation

EDCF Tied Project Targeting (Top Priority)
Core StrategyKorea Eximbank advance consultation → tied registration → direct contract
Target FirmsGIS, transformer, cable, signaling, and electrification firms
Scale$1.7B+ in EDCF tied projects estimated
Preparation TimeMinimum 6 months advance preparation required
MDB ICB Project Targeting
Core StrategyPrepare ADB/WB/JICA bid documents in English + secure track record
Target FirmsAMI, rolling stock, and large-scale construction firms
Scale$900M+ (including AMI)
NoteChinese and Japanese competition strong; technical differentiation essential
Submit Application
Submit sector interest and technical capabilities to KOTRA Dhaka Trade Office; request consultation matching
Attend Presentations and Gather Information
Listen to all 7 agency presentations; capture project details and bid schedules
1-on-1 Consultations
Consult with target agency staff; present technical catalogs and track record documentation
Korea Eximbank Consultation
Advance consultation on EDCF tied eligible projects; confirm tied financing feasibility
Bid Preparation and Follow-Up
Prepare ICB bid documents; identify local partners; utilize KOTRA follow-up bid support
ECNEC National Planning Commission PresentationNational infrastructure investment priorities and $45B+ approved projects
PGCB Power Grid Presentation400kV transmission grid and GIS substation modernization projects
Infrastructure RoadshowPPTEvent StructureKOTRAInfrastructure Cooperation