The Sonagazi 110MW Solar Project is a large-scale photovoltaic power station being built in Sonagazi, Feni, in Bangladesh. It is a flagship program under the Bangladesh Power Master Plan 2041, aimed at expanding the share of renewable energy.

The project is tendered by BPDB (Bangladesh Power Development Board) and can be implemented either through the IPP model or EPC contracting. Estimated annual generation is about 150 GWh, enough to supply electricity to more than 100,000 households in and around Sonagazi.

110MW
Capacity
Solar
Sonagazi
Location
Feni region
USD 120M+
Project Cost
Estimated
BPDB
Developer
Power Development Board
ADB/GCF
Financing
Climate finance
250+ acres
Site Area
Converted farmland
150 GWh/year
Generation
Expected
18 months
EPC duration
Under EPC schedule

Technical Specifications

Sonagazi 110MW Solar Technical Specifications
ItemSpecificationQuantityNotes
ModuleMono PERC 550W+200,000+ pcsBifacial-compatible
InverterCentralized 3.15MW35+ unitsString-based alternative available
Substation33/132kV1 unitGrid connection via PGCB network
Transmission line132kV overhead line10km+Nearest substation to interconnect
TrackerSingle-axis trackerOptionalPotential generation increase of 15%+

Site and Environmental Conditions

Site Conditions
Solar Irradiance4.5kWh/m²/day (annual average)
TopographyFlat farmland
AccessibilityNear N1 Highway
Grid Access132kV substation within 10km
Environmental and Social Issues
Land conversion250+ acres with farmer compensation
Monsoon floodingRequires drainage and landfill work
Cyclone riskWind design for 50m/s+ essential
Environmental reviewEIA approval required

Korean Business Opportunities

01
Solar EPC Execution
Korean EPC firms can participate in design, procurement, and construction of the 110MW solar plant, leveraging references from large-scale domestic projects such as 100MW-class projects in Saemangeum and Youngam.
02
Solar Module and Inverter Exports
High-efficiency modules (Mono PERC 550W+) and inverters from firms like Korea Hanwha Q CELLS and Korean Energy Technology can be exported. A package solution that combines bifacial modules and single-axis trackers can further optimize annual yield.
03
Substation and Grid Integration
Participation is possible in civil works for 33/132kV substations and 10km transmission lines, applying LVRT and reactive power support technologies to handle solar output variability.
04
Operation and Maintenance (O&M)
Korean firms can enter into long-term O&M contracts for 25 years. Smart O&M services such as panel-cleaning robotics, drone inspections, and AI-based predictive maintenance could improve performance.

Project Participation Flow

Solar Project Participation Flow
Project Information
BPDB·ADB
PQ Submission
Solar project portfolio
Bidding
EPC route
Construction
18 months
O&M
25-year operation

Sonagazi 110MW is one of the largest solar plants in Bangladesh and a realistic opportunity for Korean solar technologies and equipment to support demand under the national renewable roadmap.

135MW Solar Plant BPDBReview the BPDB 135MW solar plant project
765kV PGCB Transmission LineReview the 765kV extra-high-voltage transmission project
solar energy110MWSonagazirenewablespower
Sonagazi 110MW Solar Project | Dhaka Trade Portal