765kV Transmission Line PGCB Project

765kV Transmission Line PGCB Project Overview

The 765kV transmission line project is a high-voltage line construction program implemented by the Bangladesh Power Grid Company Limited (PGCB). Its core objective is to upgrade the existing 230kV/400kV network to 765kV and secure high-capacity power transfer while strengthening grid stability.

Bangladesh's power demand is increasing by about 8 to 10 percent annually, and grid bottlenecks in transmission are increasingly severe as generation grows. The 765kV ultra-high-voltage corridor is therefore a strategic infrastructure step to resolve transmission bottlenecks at the system level.

765kV
Voltage
ultra-high voltage
200km+
Total Route
planned
USD 800M+
Project Cost
estimated
PGCB
Client
State utility
JICA/ADB
Financing
multilateral
3,000MW+
Capacity
transfer capacity
500+
Towers
new structures
3 sites+
Substations
765/400kV

Route Plan

765kV Transmission Line Route Plan
SegmentFrom - ToLengthCapacityFinancing Source
Segment 1Bagerhat-Dhaka80km3,000MWJICA
Segment 2Dhaka-Mymensingh60km2,000MWADB
Segment 3Bagerhat-Chittagong60km2,500MWJICA

Technical Specification Comparison

Current Transmission System
Top Voltage400kV (partial lines)
Dominant Level230kV (most lines)
Transfer Capacity500~1,000MW per circuit
Loss Rate4~5% (long haul)
Post-Upgrade at 765kV
Voltage765kV ultra-high voltage
Transfer Capacity3,000MW+ per circuit
Loss RateTarget 1.5~2%
Grid ReliabilityN-1 security level

Korean Participation Opportunities

01
Transmission Towers and Equipment Export
Korean firms can produce and export 765kV transmission towers (500+ units), ultra-high-voltage conductors (ACSR 4-bundle), conductors and tension hardware, and wire fittings. KEPCO's experience on domestic 765kV lines, such as Sinan-Singapyeong, is a key reference; products from Korea Cable or Daehan Cable are aligned with international standards.
02
765kV Substation EPC
Korean companies can join EPC execution for 765/400kV substations at three planned sites, including GIS, transformers, protective relays, and SCADA systems. Firms such as Korea Power Systems Industries and Korea Electric Co have competitive positions in ultra-high-voltage substation equipment.
03
Transmission Line Construction
Korean construction firms may participate in building the 200km+ corridor (foundations, tower erection, stringing). Large towers (50m+ in height) and ultra-high-voltage stringing work require specialized technical capability, and KEPCO affiliates (KEPCO KDN/KEPCO KPS) can offer technical support.
04
Grid Operations Technology Transfer
Technology transfer for EMS, grid studies, and protection coordination needed for 765kV operation is possible. KEPCO's grid operation know-how can be used to strengthen PGCB's operational capacity.

Project Participation Flow

Participation Flow for the 765kV Transmission Project
Project Information
JICA·PGCB
Prequalification
Ultra-high-voltage track record
Bid Submission
Technology + Price
Execution
48 months
Grid Integration
commissioning test

The 765kV transmission line is a structural upgrade to Bangladesh's power system and a high potential project where Korean ultra-high-voltage technology and equipment can be deployed at scale.

Power Transmission + Renewable EnergyReview transmission-grid integration for renewable energy projects
Sonagazi 110MW Solar ProjectReview the Sonagazi 110MW solar power development details
transmission765kVPGCBpowerinfrastructure
765kV Transmission Line PGCB Project | Dhaka Trade Portal